Electrical work in an apartment
Inside an apartment, part of the electrics belongs to the unit and part to the building. Knowing where the line falls decides who can change what.
Apartments generally have a small board inside the unit feeding lights, sockets, the kitchen and the fan coil units, while the incoming supply, meters, corridor lighting, fire alarm devices and shared systems belong to the building. Work on the unit’s own circuits is usually possible with the building management’s permission; work touching building systems is for the building’s own contractors.
Property guides describe how electrical work changes with the type of building it happens in.
Construction also limits what is practical. Concrete ceilings and walls make new cable routes difficult, so additions often use false ceilings, bulkheads or neat surface trunking. Most towers require a work permit, restrict noisy work to certain hours and ask for contractor details in advance. Tenants normally need the landlord’s agreement too.
01In short
The points that matter most
Unit versus building
The unit board is yours; risers, meters and alarms are not.
Permits are normal
Most buildings want notice and contractor details.
Concrete limits routes
New cables often go in ceilings or trunking.
02Detail
What is usually possible
Lighting changes
Swapping fittings, adding downlights in existing false ceilings and adding dimmers.
Extra sockets
Extending existing circuits where routes allow, often in trunking on concrete walls.
Kitchen alterations
Moving appliance supplies during a kitchen refit, within the unit’s circuits.
Fan coil supplies
Checking the supply and isolator to a fan coil; the unit itself may be maintained by the building or by a separate contractor.
03Checklist
Before booking
Ask the building management
About permits, working hours and what they need from the contractor.
Get landlord consent
If you rent, agree the work in writing.
Photograph the unit board
And note anything that trips.
04Questions
Questions people ask
- Who fixes a dead corridor light outside my door?
- The building management, since corridor lighting is a shared system.
- Can I add downlights to a concrete ceiling?
- Not directly in most cases; a false ceiling or bulkhead is usually needed to hide cables and fittings.
- Why does the building ask for a permit for small jobs?
- It needs to know who is working in the tower, when, and that shared systems will not be affected.
- Can a tenant arrange electrical work?
- Usually with the landlord’s agreement and the building’s permit.
- What if the whole apartment loses power?
- Check the unit board first; if nothing has tripped, the building management can check the supply side.
05Related
Related guides
- Electrical work in an officeThe same work in a different kind of property.
- Electrical work in a shopThe same work in a different kind of property.
- Using extension leads and adaptors safelyA related safety point or decision.
- Electrical safety in bathroomsA related safety point or decision.
This guide sits under electrical work. All topics are on the guides page.
—NEXT
Planning work in an apartment?
Tell us the building and what you want to change. We will explain what the permit usually needs.