—By type of property
Electrical work in a shop
A shop’s electrical layout is part of how it sells. Lighting, signage and till points are planned with the merchandise, not after it.
Shop electrical work is often part of a fit-out or refit: track lighting over displays, shelf and cabinet lighting, window lighting, illuminated signage, power at the till and for card terminals, and supplies for any refrigerated units or back-of-house equipment. The layout is driven by where products, fixtures and the counter go.
Property guides describe how electrical work changes with the type of building it happens in.
In malls, the unit’s installation must meet the centre’s fit-out rules. The mall typically wants drawings, a permit, contractor details and work done outside trading hours. High-street units have fewer rules but the same need to finish work without disrupting trading, so most changes happen at night or before opening.
01In short
The points that matter most
Lighting follows displays
Track and spots are aimed at products.
Mall fit-out rules
Approvals and permits come before work.
Night working
Changes avoid trading hours.
02Detail
What a shop fit-out covers
Track and display lighting
Track positioned so heads can be re-aimed as displays change.
Signage supplies
Power and timers for fascia and window signs, positioned for access.
Till and counter power
Sockets and cable management for tills, terminals and printers.
Back-of-house
Stockroom lighting, staff kitchen supplies and any equipment the shop relies on.
03Checklist
Before a fit-out
Get the mall’s fit-out guide
It sets drawings, permits and working hours.
Fix the display plan
Lighting positions follow it.
Allow for change
Track lighting is easier to adapt than fixed spots.
04Questions
Questions people ask
- Why use track lighting in a shop?
- Heads can be moved and re-aimed when displays change, without new wiring.
- Who connects the shop to the mall supply?
- The mall’s rules decide; usually the tenant’s contractor works from the unit’s board onwards.
- Can signage be controlled by a timer?
- Yes. Timers or photocells switch signs on and off without staff remembering.
- Can work happen while the shop trades?
- Small tasks sometimes; anything noisy or involving shutdowns is done out of hours.
05Related
Related guides
- Electrical work in an older villaThe same work in a different kind of property.
- Electrical work in a villaThe same work in a different kind of property.
- Outdoor electrical safetyA related safety point or decision.
- Choosing an electricianA related safety point or decision.
This guide sits under electrical work. All topics are on the guides page.
—NEXT
Fitting out a shop?
Send the layout and the mall’s fit-out guide. We will plan lighting and power with you.